The new paved road has drainage for 44 kilometers, and a bridge was built over the Pantano River with a length of 70 meters.
This road section directly benefits the communities and neighborhoods of Los Lotes, El Palmar del Oratorio, Villa Flor, El Mesón, Las Lomitas and Loma Linda, all belonging to Santa Cruz department.
The total road access is 44.13 kilometers and ten meters wide of road and a thickness of 22 centimeters of rigid and reinforced pavement.
This road with its respective road signs allows heavy transport traffic up to a maximum of 105 tons, which contributes to the demands of the oil and agro-industrial activity in the area.
The objective of the construction of this highway is to ensure the transit of tankers that transport Liquefied Petroleum Gas and Liquefied Natural Gas from the Rio Grande plants and the Oro Negro refinery. But in addition, the transportation of agricultural production from producers in the region