IMPROVEMENT AND EXPANSION OF THE AIRPORT ANIBALARAB FADUL DE COBIJA

8 Jun
  • Preparation of master plan: descriptive report, calculation report, plans.
  • Preparation of the pre-investment technical design study for the improvement and expansion of the airport (airfield and land side) and problem solving.
  • Runway and taxiway design, geometric design, pavement design, visual aids and radio aids, longitudinal and transverse flight field drainage.
  • Boing 737-300 designer aircraft
  • Reference key: 4C
  • Runway length: 2600 m
  • Track width: 45 m
  • Rolling surface: asphalt layer (e=10cm)
  • Drainage design of public and parking areas
  • construction of the airport (L=2600 m x 45 m), platform of 14,709.12 square meters
  • Construction of the control tower (H=22.29), technical block (357.42 square meters)