Construction of two circulation channels in each direction and shoulders, including 16 pedestrian walkways and 14 bridges, in addition to 130 drainages.
This road is the second Trunk of Bolivia, which communicates with Peru. The project included earthworks, paving, walkway structures, bridges, drainage and road markings for a 56 km length of road.